Pye Telecom History Group - Virtual Pye Museum
Rely on Pye logo
The Product History of Pye
 Two-Way Radio
1939 to 2002
60+ years of radio communications

Photo Gallery - Products

The Story of the Vanguard - 1962
This series of photographs taken in March 1962 at Ditton Works, Newmarket Road, Cambridge, illustrates the major stages of introduction of the first model in the Vanguard range, from design to despatch.  See how many people you recognise!
 
 1. Vanguard electrical design
2. Vanguard mechanical design 
3. General view of Drawing Office 
4. Parts Listing Dept
1.  Electronic design of the
  Vanguard PT B10AM

2.  Mechanical design
3.  General view of Drawing Office at rear of Mobile Lab 4.  Parts Listing Department


 Purchasing & Progress dept.
IMB Computer Mainframe Dept. 
Pye Transportsystem radio control room 
Pye Telecom training school
5.  Purchasing & Progress Dept.
6.  IBM mainframe computer room
7.  Control Room of the internal Pye Transport radio system
8.  Pye Telecom Training School


 Production planning meeting
 Production model assembly
Electrical Inspection Dept. 
Stores issue of materials to production
9.  Production planning meeting
10.  Assembly of production models
11.  Electrical Inspection Dept. testing of incoming components
12.  Stores pick and issue materials to the production lines

 Sub-assembly dept view1
Sub-assembly Dept. view2 
Printed Circuit Board Test Dept. 
Main Assembly Dept view1
13.  Sub-Assembly Dept.  assembly of transmitter PA and aerial filters
14.  Sub-Assembly Dept.
 assembly of mobile control boxes
15.  Test of printed circuit board sub-assemblies
16.  Main Assembly Dept. viewed from front right hand end

 Main Assembly Dept. view2
Vanguard mechanical assembly view1 
 Vanguard mechanical assembly view2
Vanguard electrical assembly view1
17.  Main Assembly Dept. viewed from front left hand end
18.  Mechanical assembly stage 1 - the first stage on the production line
19.  View showing the 5 stages of mechanical assembly
20.  A typical production line wiring assembly stage - view 1

 Vanguard electrical assembly view2
Vanguard line inspection stage 
Vanguard test view1 
Vanguard test view2
21.  A typical production line wiring assembly stage - view 2
22.  Line Inspection stage where  each equipment is visually checked
23.  Finished equipment electrical alignment and test - view 1
24.  Finished equipment electrical alignment and test - view 2

 Equipment soak test
 Equipment bump and vibration test
Crystal count stage 
Final test Dept
25.  Each equipment is soak-tested for a burn-in period
26.  Samples of equipment are subjected to vibration testing
27.  Each equipment is adjusted to the precise operating frequency
28.  Samples of equipment are subjected to final electrical tests

 Final Inspection Dept
 Air-test
Despatch Dept. view1 
Despatch Dept. view2
29.  Each equipment is subjected to final visual checks 30.  Each equipment is air-tested with its own ancillary items 31.  Each equipment is packed with its own ancillary items
32.  Finally the equipments are loaded on to a van for despatch

Despatch Dept. view3 
Vanguard AM25B 40 years later 
 

33.  Company vans will deliver  equipment to the end customers
34.  And here is an AM25B that was made about 40 years ago


Top of page



Top of page
  Home

V2.0 - Date 26-01-2006 modified 12-08-2006

Copyright © reserved 2002 - 2006 Pye Telecom History Group, Cambridge, England